Full-stack digital infrastructure

Provide full-stack data center and disaster recovery solutions to accelerate enterprises digital transformation

Customer Benefits

The comprehensive solution achieves a low PUE (Power Usage Effectiveness) and reduces the operating costs of the data center.
Unattended computer rooms, reduce personnel maintenance costs and enhance the economic efficiency of computer room operation and maintenance.
Dual-line and dual-link planning is adopted to establish independent circuits for each node in the data center.
Standardized planning, design and construction processes, help to achieve the national standard B-level certification.

Solution Background

IT asset can only achieve its benefits through stable and reliable operation, which relies on the strict environmental conditions of the computer room, including temperature, humidity, cleanliness, noise, vibration, static electricity, electromagnetic interference, and their control accuracy. Therefore, the design and construction of computer room projects is a key aspect.
Data center computer room projects involve multiple specialized technologies such as air conditioning technology, power distribution technology, automatic detection and control technology, anti-interference technology, comprehensive wiring technology, purification, fire protection, architecture, and decoration.

Requirement Analysis

Standard

The design must be strictly in accordance with the relevant national standards for computer rooms

Reliability

Stable site selection, high-standard building structure, uninterrupted power supply and air conditioning equipment with backup; dual-circuit supply of power supply and lines, etc.

Cost

It requires lower construction costs and less manpower to maintain system operation, providing high efficiency and high benefits.

Scalability

Support the existing system, while also providing sufficient expansion space in terms of spatial layout and system capacity, making it convenient for the system to meet the needs of future development.

Solution Introduction

To meet the increasing demands for business development and the expansion of network information equipment, construct a standardized data center computer room, strictly following national standards.
Upon completion, the computer room can fully meet the requirements of temperature, humidity, cleanliness, illumination, waterproofing, anti-interference, anti-vibration, lightning protection, real-time monitoring, and being unmanned-operated. It can meet the requirements for the safe, stable, and reliable operation of various business networks and server equipment of the group and its subordinate companies. At the same time, it also needs to create a comfortable environment. Therefore, in the design of the computer room, it is required to have a reasonable layout, complete functions, advanced facilities, stable operation, and beautiful and elegant decoration, reflecting the characteristics and style of a modern computer room.

Solution Advantages

Low construction cost
The entire computer room retains and extends the investment in existing systems as much as possible, making full use of past investments.
Downing operation cost
Through planning and design, the PUE of the computer room can be reduced, directly reducing daily operating costs.
Unattended datacenter
Disaster recovery computer rooms in different locations within the same city can be unmanned for a long time through digital monitoring of various systems.
NSC Certified
On the basis of limited budget, we ensure the delivery of Class B computer room standards and successfully achieve national standard computer room certification.